top of page

Skateboard Rink, Skating Rink and Skateboard Rink

The Skateboard Rink, Skating Rink and Skateboard Rink project aims to provide a modern area for young people and those interested in outdoor sports.

1. General Description


The Skateboard Rink, Skating Rink and Skaterboard Rink project aims to provide a modern area for young people and those interested in outdoor sports. This facility is equipped with concrete surfaces, ramps, rails and other equipment for skateboarders. It is designed to provide entertainment and sports experience in an environment intertwined with nature. Irmak East Region and Irmak West Region are suitable areas for this project with their width and natural surroundings.


2. Project Steps


Preparation Phase:


Site Selection: Determination of a suitable area and land analysis.


Design Studies: Design of the structure of the tracks, ramps and social areas.


Feasibility Study: Technical, environmental and economic analyses.


Implementation Phase:4. Infrastructure Studies: Preparation of the ground for the track and concrete pouring.5. Equipment Installation: Ramps, rails, benches and lighting systems.6. Landscaping: Walking paths, seating areas and landscaping works.


Last Stage:7. Testing and Safety Controls: Checking whether the tracks are safe for use.8. Opening and Promotion: Launching with social media campaigns.


3. Project Duration and Term


This project is among the medium-term projects. It is expected that the design, infrastructure and construction processes will be completed in 8-12 months in total.


4. SWOT Analysis


Strengths:


An attractive social area for young people and sports enthusiasts.


Encourages active life in the region.


A sports facility in harmony with nature.


Weaknesses:


Long-term maintenance and security costs.


Risk of limited use if proper promotion is not made.


Opportunities:


Potential to attract the attention of local and foreign tourists.


Increasing the attractiveness of the region with sports activities for young people.


Threats:


Risk of construction delays due to environmental sensitivities.


Weather conditions may affect outdoor activities.

Power in Numbers

​

Programs

​

Locations

​

Volunteers

Project Gallery

  • Facebook
  • Instagram
bottom of page